
Vapor Suite
Segal PlumbingSteam shower management
An extended steam-management brief for a larger bathing suite.
What you get.
Segal Plumbing
Vapor joins a separate steam generator, room controller and outlet arrangement within a coordinated shower brief. The generator sits in a serviceable plant location; delivery pipework, drainage, room construction, ventilation and temperature sensing are specified together. Vapor Suite uses a proposed 550 × 250 × 450 mm envelope for the extended plant envelope. Water supply, drainage, electrical interfaces where required, isolation, maintenance access and the surrounding room are established during specification. The selected function package is coordinated with the connected fixtures; final flow, thermal protection and operating behavior are confirmed through the project engineering brief.
Format
Extended plant envelope.
Function
Steam session control brief / Steam, shower and ventilation coordination brief.
Service
Separate steam plant, room interface and outlet-management brief.
Extended plant envelope
Width: 550 mm. Depth: 250 mm. Height: 450 mm. Dimension basis: Proposed product body; installation and service clearances specified separately
Build the frontier
with us.
Share the objective, the requirements, and the business you want to reach. Project and partnership enquiries all come through the same form.
Discuss a Project