Every part.
One industrial network.

Segal Supply

Industrial procurement built around the requirements of the build.

Segal Supply connects the specification to the supplier, the approval, and the delivery.

Make the specification clear.

Make the specification clear.

Catalog

Industrial sourcing begins with a precise description of what the build requires.

Tools, fasteners, electrical components, measuring instruments and consumables are organized around their technical characteristics. Material, dimensions, ratings and documentation guide supplier comparison. Availability is established during quotation so that a catalog entry does not substitute for a confirmed supply commitment.

  • Tools

    Task and duty requirements guide equipment selection.

  • Hardware

    Dimensions, material and grade define the required part.

  • Measurement

    Range, accuracy and calibration requirements inform instrument sourcing.

Connect each line with its approval.

Connect each line with its approval.

Procurement

A structured bill of materials supports a traceable procurement process.

Requests, quantities, specifications and approvals belong within the same record. Alternatives are reviewed against the original requirement, and items with special handling conditions require the appropriate documentation. The resulting scope gives sourcing and receiving teams a common reference.

  • Bill of materials

    Each line connected with a request and specification.

  • Approval

    Release and substitution decisions retained in the record.

  • Documentation

    Certificates and handling requirements identified for the item.

Plan around a confirmed supply window.

Plan around a confirmed supply window.

Delivery

Destination, required date and handling conditions form part of the sourcing requirement.

A quotation establishes stock, lead time and shipping arrangements for the specific request. Site access, receiving hours and delivery constraints are considered before an order is released. The aim is a clear commitment that the project team can use in its own schedule.

  • Availability

    Stock and lead times confirmed through the quotation.

  • Destination

    Access and handling requirements established for the receiving site.

  • Coordination

    Delivery assumptions connected with the project schedule.

Products

The parts, specified and sourced.

Tools, hardware, electrical, and instruments, with a procurement desk that keeps the record.

Tools

Tools

Catalog

Tools chosen for the task, the duty, and the hand that uses them.

01 / 05

Depot

Four bins and a desk.

Tools

The floor

Hardware

Fasteners

Electrical

The power path

Measure

The tolerance

Procurement — the bill

What the build reaches for, and the desk that approved it to ship. The bins are stocked in parallel.

Technical sourcing

Part numbers, materials, dimensions and performance requirements establish a clear basis for comparison.

Procurement records

Bills of materials connect requests, approvals and supplier documentation throughout the sourcing process.

Delivery planning

Quantity, destination, handling, and the required date are part of the quotation.

Work with Supply

Send the bill of materials, required specifications, quantities and delivery location to frame a sourcing request.

Build the frontier
with us.

Share the objective, the requirements, and the business you want to reach. Project and partnership enquiries all come through the same form.

Discuss a Project